Sprint 2 requirements and rubric traceability

Document information Details
Project Sport Analytics Tool
Milestone Sprint 2
Related issue #420
Purpose Map the Intermediate Sport Analytics requirements and every Sprint 2 rubric criterion to auditable repository evidence
Evidence cut-off 15 September 2026; evidence current through #417 P05/P06 formal submitter testing and #540 season-scale publication acceptance
Close-out owner #298 reviews this record before Sprint 2 milestone tagging
Status Traceability is current through formal Sprint 2 testing and season-scale acceptance; the team retrospective is recorded, while final stakeholder close-out and milestone tagging remain under #298

1. Purpose and evidence policy

This record gives a marker one place to verify the Sprint 2 requirement and rubric evidence without reconstructing the project history from individual issues, Pull Requests and commits.

For each Intermediate requirement it records:

  • implementation status;
  • the issue and representative Pull Request/commit;
  • relevant automated or integrated verification;
  • the main documentation/evidence source; and
  • a known limitation or remaining close-out action where one exists.

For the Sprint 2 rubric it maps each criterion to the repository evidence that supports it. This page is an evidence index, not a replacement for the linked source records. Gitea remains authoritative for current issue and Pull Request state.

The statuses deliberately distinguish implementation from final deployed acceptance. A feature is not marked fully verified merely because code and tests exist when the representative deployed acceptance record still contains an unresolved failure.

2. Status definitions

Status Meaning
Implemented The requirement is implemented and has representative automated/integrated evidence.
Implemented with follow-up fixes The requirement is implemented, and defects found during Sprint 2 were separately tracked and repaired.
Verification pending The implementation and regression coverage exist, but a required representative deployed retest is still outstanding.
Partial A meaningful part is implemented, but a material requirement or evidence gate remains incomplete.
Carry-over Work is intentionally not claimed as complete for Sprint 2 and remains for later close-out.

3. Intermediate Sport Analytics requirements

The Intermediate tier in the project brief requires the Basic platform to grow into a staged, reviewed, resumable and idempotent batch pipeline; add broader and selectively recomputed aggregates; prove correctness and representative-scale performance; harden the API with versioning, consumer controls and caching; and publish reproducible versioned dataset releases.

Intermediate requirement Status Issue(s) Representative PR / commit Automated or integrated verification Documentation / evidence Known limitation or remaining work
Stage whole seasons/back catalogues before publication Implemented with follow-up fixes #277, #357, #358, #359, #360, #361 PR #381 / 1828f2c; PR #431 / 3f54476 apps/backend/tests/api/batches.test.ts; apps/backend/tests/database/batch.repository.database.test.ts; apps/frontend/src/features/submissions/BatchUploadPage.test.tsx; tests/e2e/submissions.spec.ts docs/api/season-upload-contract.md; docs/data/batch-submission-packages.md; docs/architecture/batch-ingestion-pipeline.md Season-scale acceptance exposed review/usability defects that were split into follow-up issues rather than hidden inside the staging work.
Process staged batches asynchronously Implemented with follow-up fixes #278, #365, #463, #524, #540 PR #399 / f490227; PR #464; worker auto-deploy follow-up #524; PR #549 / #556 publication follow-ups Worker/service tests; apps/worker/tests/batch-publication-job.test.ts; #463 live acceptance; #540 recovery and season-scale deployed acceptance docs/deployment/azure-worker.md; evidence/validation/issue-463-dev-worker-deployment.md; evidence/acceptance/issue-540-season-scale-publication.md Durable asynchronous validation/publication is proven in deployment, including recovery of the originally stranded #364 season workload.
Report accepted and rejected outcomes with actionable item detail Implemented with follow-up fixes #279, #366, #367, #465, #471, #499 PR #414 / b091385; PR #400 / 4c89649; PR #507 / bcb9635 Batch API/service tests; BatchReportsPage.test.tsx; focused Intermediate acceptance; #417 P05/P06 formal submitter sessions docs/api/batches.md; evidence/validation/issue-364-intermediate-ingestion-acceptance.md; Sprint 2 user-testing summary Formal #417 testing is complete. Pending P06 findings remain visible for explicit disposition/carry-over rather than being treated as missing evidence.
Resubmitting equivalent data does not double-count Implemented #280 PR #401 / a4ab116 Batch service/database idempotency coverage and #463 duplicate-safe live publication docs/architecture/batch-ingestion-pipeline.md; evidence/validation/issue-463-dev-worker-deployment.md No known requirement gap; continue regression coverage as ingestion paths evolve.
Resume interrupted validation/publication rather than restart Implemented with follow-up fixes #281, #463, #540, #551 PR #405 / b59bd09; PR #553 / 046b42a; PR #549; PR #556 Worker checkpoint/lease tests; apps/worker/tests/batch-publication-job.test.ts; #463 recovery evidence; #540 recovery of the original stranded season-scale batch docs/deployment/azure-worker.md; docs/testing/intermediate-ingestion-acceptance.md; evidence/acceptance/issue-540-season-scale-publication.md Original #364 stranded publication resumed to published; a fresh representative job then completed in one attempt.
Require review before publication Implemented with follow-up fixes #283, #362, #479, #480, #540 PR #423 / 6f8e53d; PR #434 / 0784932; PR #491 / 80cccc5; PR #504; PR #549 Backend batch review tests; BatchReviewWorkspacePage.test.tsx; focused reviewer E2E; P04 reviewer session; #540 deployed async-publication acceptance docs/api/batches.md; evidence/user-testing/sprint-2/2026-09-10-P04-reviewer.md; evidence/acceptance/issue-540-season-scale-publication.md Review approval is durable and publication is handed to a background job rather than blocking the reviewer request.
Catch impossible or conflicting cricket data Implemented with follow-up fixes #282, #522, #529, #537 PR #412 / d5828e6 + validation commits; PR #523/#527 conflict reconciliation; PR #538 Contracts, batch service/database/worker tests; BatchReviewWorkspacePage.test.tsx; season-scale conflict-resolution exercise docs/architecture/batch-ingestion-pipeline.md; evidence/validation/issue-364-intermediate-ingestion-acceptance.md #537 follow-up is repaired: blocking references/conflicts are exposed through report.blockingItems independently of ordinary pagination.
Preserve correction history Implemented with follow-up fixes #284, #484, #539 PR #404 / 2de6b8f; PR #503 / fd01448; PR #548 / 78c068b Database/API correction coverage; worker correction tests; tests/e2e/corrections.spec.ts; lineage frontend/API/database tests docs/database/schema.md; docs/api/provenance.md; docs/api/batches.md #539 repair is merged: corrected submissions expose predecessor/replacement lineage through replacesBatchReference / supersededByBatchReference.
Derive season, career and competition-wide aggregates Implemented #285, #476 PR #411 / 5a2c92e; PR #490 / 4ca36f0 participant-aggregates unit/API/database tests docs/statistics/participant-aggregates.md Additional scorecard presentation improvements from user testing are product UX work, not a derivation correctness gap.
Recompute only figures affected by event changes Implemented #286 PR #427 / 3cf51ce Correction/database refresh coverage; dependency-aware refresh tests in the statistics path docs/statistics/participant-aggregates.md; ADR-009 Continue performance monitoring as more aggregate types are added.
Verify figures against known-correct reference results Implemented #287 PR #316 / d443bfc apps/backend/tests/database/reference-figures.database.test.ts; reference fixture/database tests docs/development/reference-fixtures.md Reference corpus should expand as new statistics are introduced.
Exercise representative load and meet stated response-time targets Implemented with follow-up fixes #289, #290, #410, #364, #540 PR #408 / 726f744; PR #409 / c799ef6; PR #429 / 560458c; PR #549; PR #556 / b68158c Public-read benchmark/query-plan tests; apps/worker/tests/batch-publication-throughput.test.ts; deployed #364/#540 measurements docs/development/performance-baseline.md; evidence/validation/issue-410-post-change-measurement.md; evidence/validation/issue-364-intermediate-ingestion-acceptance.md; evidence/acceptance/issue-540-season-scale-publication.md Representative workload: 70 fixtures / 16,713 events. Validation passed in 4m27s and final post-#540 publication passed in 3m37.235s, both within <=15m.
Version the API Implemented #291 PR #340 / 6280c52 API version-routing/contract tests and OpenAPI lint docs/api/versioning.md; docs/api/overview.md Future breaking versions must follow the documented deprecation path.
Issue consumer API keys and enforce rate limits/quotas Implemented #292 PR #424 / 3f49174 apps/backend/tests/api/api-consumers.test.ts; apps/backend/tests/database/api-consumers.database.test.ts docs/api/consumer-keys.md; docs/security/roles-and-permissions.md Operational monitoring/consumer-usage reporting can be extended in Sprint 3.
Cache repeated reads with correct invalidation Implemented with follow-up fixes #293, #369, #430 PR #427 / d88c529; PR #402 / 5d14c4f; PR #449 / 2c3b145 fixture-statistics.service.test.ts; database invalidation coverage; issue #293 evidence ADR-009; evidence/validation/issue-293-cache-performance.md Cache failures are designed not to fail authoritative published reads; continue observing deployment latency.
Publish versioned immutable dataset releases with schema/field docs and checksum Implemented with follow-up fixes #294, #458, #533 PR #439 / 740afde; PR #461 / b6116bf; PR #545 / async release commits Dataset release unit/API/contracts/database-independent tests; admin release E2E Dataset release section in API/data docs; evidence/validation/issue-458-admin-dataset-release-workflow.md Full-corpus synchronous generation failure #533 was replaced by durable asynchronous generation. Final deployed release publication evidence should be confirmed during #298 close-out.
Provide a release catalogue and download workflow Implemented with follow-up fixes #295, #467, #468, #475 PR #451 / 0e49ccc; PR #493 / 923449a; PR #474 / 31ee2d9; follow-up public UX PRs Dataset release page tests; admin release E2E; public user-testing findings/retests docs/data/dataset-exports.md; Sprint 2 user-testing summary User testing found export pagination/readability/navigation defects; several fixes are merged, while remaining accepted UX findings stay visible in the user-testing summary.
Preserve end-to-end provenance from statistic to source submission/review Implemented #363 PR #440 / 475f67f Provenance contract/unit/API tests; PostgreSQL integration coverage docs/api/provenance.md; evidence/validation/issue-363-provenance.md Public endpoints intentionally omit private provenance fields; authenticated provenance routes provide the audit trace.
Integrate a relevant external API and repair fixture-to-weather resolution Implemented with follow-up fixes #299, #300, #415, #473 PR #320 / 369c246; PR #335; PR #466 / 2347742; PR #489 / e75a904 Weather unit/API tests and fixture-weather tests ADR-008; docs/api/weather.md; docs/api/openapi.yaml Open-Meteo remains an external dependency; provider failures are isolated and documented.

3.1 Basic carry-over completed during Sprint 2

Sprint 2 also completed Basic work that Sprint 1 explicitly left partial, notably filtered fixture-event exports (#269/#270) and the surrounding public export workflow. Those changes are covered by API, database, browser and formal-user evidence and are included in the rubric mapping below rather than being misrepresented as new Intermediate requirements.

4. Sprint 2 rubric evidence

The official Sprint 2 rubric totals 100% across the ten criteria below. The evidence posture column is a repository self-check against the rubric wording, not a claim about the marker's final score.

Rubric criterion Weight Evidence posture at cut-off Repository evidence Known limitation / close-out action
Core Features 25% Intermediate requirement evidence complete; final rubric close-out under #298 Intermediate implementation matrix above; Basic acceptance #272; guided submission/review #361/#362; integrated acceptance #364; representative fixes/retests through #540 The former season-scale publication blocker is resolved and retested. Remaining open/deferred product findings stay visible and should be considered by #298 rather than being hidden.
Automated Testing 10% Advanced-target evidence present Contracts, backend unit/API, PostgreSQL integration, worker, frontend unit, Playwright E2E/accessibility, deployment/CI-routing tests; npm run check; npm run verify:intermediate-ingestion; #272/#273/#287/#296/#364 evidence #296 remains the umbrella testing close-out item; final current-main quality evidence should be linked under #298.
Stakeholder Reviews 10% Advanced-target evidence present; final stakeholder close-out pending 26 Aug approval; 1 Sep stakeholder meeting; 8 Sep asynchronous WhatsApp review; repository Sprint evidence; feedback-driven backlog changes The team retrospective is already recorded. Final Sprint 2 stakeholder close-out belongs to #298 and must not be fabricated here.
API 15% Advanced-target evidence present Handwritten Express /api/v1; published OpenAPI; public reads/exports; API consumer controls; Open-Meteo integration; versioning; deployed Azure backend evidence #298 should perform the final live availability/smoke check and record any temporary Azure capacity limitation separately from API implementation completeness.
User Feedback 10% Formal Sprint 2 testing complete; finding disposition/carry-over remains visible Task-based protocol (#264/PR #317); public/analyst #416; reviewer/admin #418 with #463 fix/retest; submitter #417 with P05/P06 and cross-session retest evidence; consolidated Sprint 2 summary #417's two external submitter sessions are complete. Four P06 findings remain Pending team disposition, and public/analyst carry-over findings remain explicit; this is outstanding product triage, not missing formal testing evidence.
Project Methodology 10% Advanced-target evidence present Lightweight Scrumban documented in docs/project_methodology.md; issue/project-board workflow; Sprint 2 planning; weekly stand-ups under #331 including 27 Aug, 3 Sep and 10 Sep; team retrospective in evidence/sprints/sprint-2/2026-09-15-sprint-2-close-out.md The retrospective is recorded. #298 still owns final stakeholder close-out, current-main verification and the milestone decision/tag.
Bug Tracker 5% Advanced-target evidence present docs/testing/bug-tracking.md; continuous labelled Gitea issue use; representative defects #367, #369, #410, #415, #430, #442, #446, #452, #463, #467-#500, #522/#529/#533/#537/#539/#540/#551 Open defects and deferred usability findings must remain visible; tracker usage is evidence of process, not proof that no bugs remain.
Database Documentation 5% Advanced-target evidence present docs/database/overview.md, schema.md, erd.md, batch-persistence.md, access.md; executable migrations and migration README; deployment/provider rationale in ADR-005 and deployment docs The #297 Intermediate documentation publication is present on current main through PR #559; #419/final close-out should still confirm consistency before milestone tag.
Third-Party Code Documentation 5% Advanced-target evidence present docs/development/technology-stack.md lists selected technologies/dependencies with versions, purposes and motivations; docs/development/dependencies.md defines review/copied-code policy; ADRs motivate external services Any new dependency added after this cut-off must be added before #298 tags Sprint 2.
Testing Documentation 5% Advanced-target evidence present docs/development/testing.md; user-testing protocol/task bank; bug-tracking policy; Intermediate acceptance runbook; performance baseline; validation/evidence index The #297 documentation publication is present on current main through PR #559; #296/#419/final close-out should still confirm current-main test evidence and link integrity.

5. Formal user-testing evidence and resulting work

The formal Sprint 2 process is task-based. The retained evidence must be read at task/finding level rather than as an informal usability narrative.

Primary records:

  • docs/testing/user-testing-protocol.md
  • docs/testing/user-testing-task-bank.md
  • evidence/user-testing/sprint-2/sprint-2-user-testing-summary.md
  • evidence/user-testing/sprint-2/2026-09-10-P01-public.md
  • evidence/user-testing/sprint-2/2026-09-10-P02-public.md
  • evidence/user-testing/sprint-2/2026-09-07-P03-public.md
  • evidence/user-testing/sprint-2/2026-09-10-P04-reviewer.md
  • evidence/user-testing/sprint-2/2026-09-11-P05-submitter.md
  • evidence/user-testing/sprint-2/2026-09-15-P06-submitter.md — together these complete the two-session #417 formal submitter-testing evidence; pending P06 findings remain for explicit team disposition

Representative feedback-to-engineering trace:

Finding / workflow Resulting issue(s) Integration / retest state at cut-off
Reviewer batch unavailable because worker path was not progressing staged work #463 Fixed and the same P04 REV-01 task was successfully repeated before the remaining reviewer/admin tasks.
Export silently truncated beyond a page #467 Fix merged in PR #493; consolidated user-testing summary still needs the final retest/close-out update.
Export lacked readable cricket context #468 Fix merged in PR #474; multiple findings verified in deployed facilitator retest.
Competition search only saw the initially loaded page #469 Fix merged in PR #470; summary close-out/retest remains to be reconciled.
Public navigation/download/API discoverability and presentation findings #475 Follow-up fixes merged; the summary remains the authoritative record for unresolved accepted items.
Career aggregates existed in the API but were absent from the player page #476 UI integration merged in PR #490.
Submitter workflow and batch terminology/validation/scope findings #417 plus #498/#499/#500/#501/#519/#520 and related fixes P05 produced five accepted findings and implementation work; P06 externally retested several improvements. Formal #417 testing is complete, while four new P06 findings remain Pending team disposition and one P05 identifier-path improvement was not exercised because P06 was blocked earlier in the single-fixture task.

6. Stakeholder and methodology evidence

Sprint 2 stakeholder evidence is retained separately from user testing:

  • evidence/sprints/sprint-2/2026-08-25-planning.md
  • evidence/sprints/sprint-2/Stakeholder/2026-08-26-sprint-2-stakeholder-approval.md
  • evidence/sprints/sprint-2/Stakeholder/2026-09-01-stakeholder-meeting.md
  • evidence/sprints/sprint-2/Stakeholder/2026-09-08-stakeholder-asynchronous-review.md
  • evidence/sprints/sprint-2/Stakeholder/2026-09-08-stakeholder-whatsapp-transcript-redacted.md

Sprint 2 stand-up evidence under #331 includes:

  • evidence/sprints/sprint-2/2026-08-27-standup.md
  • evidence/sprints/sprint-2/2026-09-03-standup.md
  • evidence/sprints/sprint-2/2026-09-10-weekly-standup.md
  • retained Teams transcripts under evidence/sprints/sprint-2/Teams Transcripts/

The team retrospective is recorded in evidence/sprints/sprint-2/2026-09-15-sprint-2-close-out.md. The final stakeholder close-out is not invented in this record and remains owned by #298.

7. Bug tracker and representative resolved defects

The project uses Gitea as the authoritative bug tracker and documents the workflow in docs/testing/bug-tracking.md. Sprint 2 defects are not removed from the evidence trail when fixed. Representative examples include:

  • 367 — CSV BOM/common media-type handling;

  • 369 — idle backend/database latency hardening;

  • 410 — participant-history query-plan performance target;

  • 415/#473 — fixture weather location resolution;

  • 430 — published statistics read failure after cache/connection faults;

  • 442/#446 — flaky browser/frontend CI tests;

  • 452 — OpenAPI lint exception audited rather than a fictitious 4xx response;

  • 463 — deployed worker path blocker found through reviewer testing;

  • 467/#468/#469 — export/search defects found through formal public-user testing;

  • 479/#480/#481/#482/#483/#484/#486 — reviewer/submission authorization and ingestion integrity fixes;

  • 522/#529 — published conflict reconciliation;

  • 533 — full-corpus dataset release publication moved to durable asynchronous generation;

  • 537/#539 — season-scale review/correction issues discovered through #364;

  • 540 — season-scale publication throughput remediation; and

  • 551 — failed batches excluded from the active-batch limit.

This is evidence of continuous defect discovery, prioritisation, repair and retest; it is not a claim that the current product contains no defects.

8. CI, deployment and integrated verification

Representative repository/deployed evidence includes:

  • evidence/validation/issue-272-basic-e2e-acceptance.md — Basic vertical-slice acceptance;
  • evidence/validation/issue-273-accessibility-responsive-audit.md — responsive/accessibility audit;
  • docs/development/reference-fixtures.md plus the reference-result database test suite for #287;
  • evidence/validation/issue-293-cache-performance.md — repeated-read cache correctness/performance evidence;
  • evidence/validation/issue-363-provenance.md — protected end-to-end provenance;
  • evidence/validation/issue-364-intermediate-ingestion-acceptance.md — integrated Intermediate pipeline and representative season-scale acceptance;
  • evidence/validation/issue-410-post-change-measurement.md — participant-history performance remediation evidence;
  • evidence/validation/issue-463-dev-worker-deployment.md — live worker/Service Bus acceptance;
  • evidence/acceptance/issue-540-season-scale-publication.md — durable publication recovery and successful 16,713-event season-scale publication in 3m37.235s;
  • evidence/validation/issue-458-admin-dataset-release-workflow.md — administrator release workflow verification;
  • evidence/validation/issue-376-dedicated-runner-verification.md and evidence/validation/issue-383-hosted-ci-optimisation-verification.md for successful hosted CI/runner evidence, together with change-aware CI work under #348/#382; and
  • deployment guides under docs/deployment/ for the frontend, backend, worker, object storage and documentation site.

The final #298 close-out should link a green hosted CI run for the final Sprint 2 main commit and repeat any deployed checks that are explicitly still pending in this page.

9. Intermediate technical documentation

The Intermediate documentation published through #297 (PR #559 on current main) and the alignment work tracked by #419 are distributed by responsibility rather than copied into one large milestone document:

  • API and OpenAPI: docs/api/
  • database schema, ERD, access and batch persistence: docs/database/
  • testing, CI, local verification and performance: docs/development/testing.md, docs/development/local-ci.md, docs/development/performance-baseline.md
  • third-party technology/dependency motivation: docs/development/technology-stack.md and docs/development/dependencies.md
  • deployment/operations: docs/deployment/
  • security/authentication: docs/security/
  • public project-process/evidence discoverability: docs/process/ (work initiated under #254)

This traceability page links those records rather than duplicating their detailed content.

10. Known incomplete / carry-over work at this cut-off

The former #364 season-scale retest and #417 formal-session gates are now satisfied. Remaining Sprint 2 close-out work is:

  1. P06 submitter finding disposition. #417 formal testing is complete, but four new P06 findings remain Pending until the team records explicit Accept / Defer / Reject decisions and issue links where appropriate.
  2. Public user-feedback carry-over. Several accepted public/analyst findings are fixed, while others remain outstanding or require explicit retest/reconciliation in the consolidated summary.
  3. #296/#419 umbrella close-out. Intermediate documentation is published; final testing/alignment work should still confirm current-main consistency and evidence links.
  4. Dataset release live confirmation. #533 replaced full-corpus synchronous generation with durable asynchronous release generation; #298 should retain final deployed confirmation for the release flow.
  5. #298 final stakeholder close-out and milestone tag. The team retrospective is already recorded in evidence/sprints/sprint-2/2026-09-15-sprint-2-close-out.md; the remaining stakeholder close-out and final tag decision remain intentionally outside #420.

These are explicit carry-over/close-out items, not hidden omissions. They do not reopen the completed #364 representative throughput or #417 formal-session evidence gates.

11. Handoff to #298

Before the Sprint 2 milestone is tagged, #298 should:

  1. review this traceability record against the current final main commit;
  2. update any row whose pending verification completed after 14 September;
  3. link the final stakeholder close-out and retain the already-recorded team retrospective;
  4. link the final successful hosted CI run and deployed smoke/acceptance evidence;
  5. confirm the completed #417/#364 evidence, #296/#419 states, and preserve remaining finding/carry-over work honestly; and
  6. tag the milestone only after the evidence reflects the actual deployed state.