Stakeholder & User-Feedback Evidence Review¶
This page reviews retained stakeholder interaction and formal participant-based user-feedback evidence from the three development Sprints. It points to source records and their decisions; it does not treat an issue being closed as proof that a participant task passed or that a finding was resolved.
Gitea remains authoritative for the current state of linked issues. These records describe what was observed, decided and verified at the time of each interaction.
Evidence model¶
| Evidence type | What it records | How it is used |
|---|---|---|
| Stakeholder interaction | Requirement clarification, product-direction feedback and prioritisation | Records a decision and any resulting action or issue where retained. |
| Formal user testing | Anonymous participant task outcomes, observations, findings and retests | Preserves Success, Partial or Failure per task; a later code change does not rewrite that result. |
| Technical verification | Automated, integration or deployed system checks | Provides engineering evidence only; it is not substituted for participant feedback. |
The task-based evidence chain is task -> observation -> finding -> decision -> issue/fix -> retest. An accepted finding may be fixed and retested, deferred with its rationale, or rejected where the recorded decision says so. The user-testing protocol, session template and ADR-013 define the retained process.
Stakeholder interactions and decisions¶
| Sprint | Retained interaction | Recorded decision or follow-up |
|---|---|---|
| Sprint 1 | 4 August initial direction; 11 August progress review; 18 August requirements review | The team selected the sport and prioritised visible frontend/authentication work; later records linked database capacity, approved-submitter access and statistics actions to their relevant Gitea issues. The roadmap was confirmed on 18 August. |
| Sprint 2 | 1 September review; 8 September asynchronous review; 15 September retrospective review | The failed 1 September submission demonstration was treated as a real reliability priority, not completed functionality. The 8 September feedback supported retaining field-level validation detail and carried review/publication confirmation forward. The 15 September reviewer feedback was accepted into Sprint 3 issues #579, #580, #581, #582 and #513. |
| Sprint 3 | 22-24 September asynchronous review | The stakeholder saw no major missing product/API capability but identified pagination-position clarity and API Explorer loading feedback. The source record retains these as minor follow-up feedback and does not claim implementation without linked issue/PR evidence. |
The chronological Sprint Evidence index provides the complete retained meeting, stand-up and close-out record. Stakeholder opinion is qualitative evidence and does not override failed tests, defects, user-feedback gates or the Definition of Done.
Formal user-feedback outcomes¶
The published Sprint summaries are the main entry points to formal outcomes. Their canonical records contain task-level evidence, severity, decision, issue/fix traceability and retest detail.
| Sprint | Discoverable summary | Decision and improvement treatment |
|---|---|---|
| Sprint 2 | Sprint 2 User Testing Summary and canonical record | Twenty-five findings were accepted, thirty-nine deferred and five pending at Sprint close-out; no finding is presented as rejected. The summary distinguishes implemented/retested work (#463, #468, #498, #499, #501 and #519) from outstanding, deferred and blocking findings such as #467 and the new-fixture workflow gap. |
| Sprint 3 | Sprint 3 User Testing Summary and canonical record | Findings record accepted, deferred and rejected counts separately. Accepted work is linked to #713, #714, #743, #716 and #783; deferred findings remain visible through #613, #770 and related records. The #605 gate is explicitly not accepted. |
The Sprint 3 summary records later implementation for P08-F01/#716 and P11-F01/#770 without replacing their original Partial outcomes: no retained participant rerun exists. Likewise, the P13/API-consumer guidance change records a successful participant retest separately from the original Partial result. Issue closure or later implementation is therefore not misrepresented as a passed user result.
Final-submission treatment¶
The Final Submission plan prioritises material stakeholder/user feedback alongside release-blocking defects, rubric gaps and current verification. Its Definition of Done requires structured final user testing with findings dispositioned and current stakeholder/Scrum evidence; those conditions are not claimed complete here until corresponding retained evidence exists.
The Final Submission Reference keeps final release checks—including unresolved user-testing findings—visible rather than assuming historical or closed issues establish final acceptance.
Evidence locations¶
| Need | Source |
|---|---|
| Stakeholder and Sprint interaction records | Sprint Evidence and evidence/sprints/ |
| Formal user-testing process and navigation | User Testing Overview |
| Task-level participant records | evidence/user-testing/ |
| Decision records | Decisions Index |
| Technical, non-user validation | Testing & Validation Evidence |